Deal Overview

Jawa 9 and 10 are two new coal-fired power plant units being developed as an expansion of the existing Suralaya coal-fired steam power plant located in Cilegon, a city in Indonesia’s Banten province. Each unit will have a capacity of 1GW each. It is projected to be in operation from 2024.

show more

Jawa 9 and 10 are two new coal-fired power plant units being developed as an expansion of the existing Suralaya coal-fired steam power plant located in Cilegon, a city in Indonesia’s Banten province. Each unit will have a capacity of 1GW each. It is projected to be in operation from 2024.

show less
Deal Volume
$ 2.6bn
Financial Close
11 November 2020

All Dealmakers

Tranches


To view all tranche and pricing information, please sign up or log in

Projects

Jawa 9 Coal-Fired Power Plant

Brownfield
Coal-fired
Indonesia
$ 1.51bn

Jawa 10 Coal-Fired Power Plant

Brownfield
Coal-fired
Indonesia
$ 1.51bn